This project was a total gut and install of a new 2500 SF first floor Men’s & Women’s Restroom/Locker Room at the Duke Energy Queensgate Operations Center. Work included new underground plumbing, new layout, drywall partitions, tile floors & walls, ceilings, light fixtures, prefabricated shower units, lockers & benches, toilet accessories, toilet partitions, sinks, and plumbing fixtures.

Our scope included:

  • Complete demolition of existing facilities
  • New underground rough in of plumbing and trench drains
  • New layout of plumbing fixtures, and prefabricated shower units
  • New ceramic tile floors and wet walls
  • New hard ceilings at showers, new acoustic ceilings at lockers
  • New toilet partitions, toilet accessories, and stone sink tops
  • New electric including LED light fixtures
  • New HVAC ductwork, diffusers, and controls
  • New hollow metal doors, frames, and hardware

This project was completed in December 2023, over the span of 5 months.

Architect: Champlin Architecture

Mechanical Engineer: ThermalTech

  • Date February 13, 2024